Land
South Stream Block 4
Survey #21 · 5 ac survey extent· 2.5 ac cultivated · 5 plots
Shares survey 21 with Z3-C2-B1. Canal-fed. Good yields for banana.
Soil
Alluvial
Avg pH 6.7 · 2.0% OM
Water
Drip
South Canal Intake
Certification
NPOP-TN-0847-B28
2021-04 → 2024-03
Risk
Flood · Drought · Erosion
South Canal Intake
Primary · good quality · 440 TDS
Certification & Inspection Timeline
Cert Body
NPOP
Cert Number
NPOP-TN-0847-B28
Last Inspection
2024-12-01
Next Inspection
2025-12-01
All 5 Plots in Z3-C1-B4· 4 active · 1 fallow
0.5 ac
21,780 sqft
Soil
Water
Location
Infrastructure
Compost: 0.7t / season
Risk
Labour (days / 0.5 ac)
2.8
Planting
1.2
Weeding/mo
1.7
Harvest
0.5 ac
21,780 sqft
Soil
Water
Location
Infrastructure
Compost: 0.9t / season
Risk
Labour (days / 0.5 ac)
3.1
Planting
1.3
Weeding/mo
1.9
Harvest
0.5 ac
21,780 sqft
Soil
Water
Location
Infrastructure
Compost: 1.1t / season
Risk
Labour (days / 0.5 ac)
3.4
Planting
1.5
Weeding/mo
2.1
Harvest
0.5 ac
21,780 sqft
Soil
Water
Location
Infrastructure
Compost: 1.3t / season
Risk
Labour (days / 0.5 ac)
3.7
Planting
1.6
Weeding/mo
2.3
Harvest
0.5 ac
21,780 sqft
Soil
Water
Location
Infrastructure
Compost: 1.5t / season
Risk
Labour (days / 0.5 ac)
4
Planting
1.8
Weeding/mo
2.5
Harvest
Shares survey 21 with Z3-C2-B1. Canal-fed. Good yields for banana.