Land
North Corner Block 3
Survey #8 · 2.5 ac survey extent· 2.5 ac cultivated · 5 plots
Survey 8. Black cotton with drip modification. Performing well for turmeric.
Soil
Black Cotton
Avg pH 7.2 · 2.0% OM
Water
Drip
North Farm Pond FP-01 + Borewell BW-01 (Z1)
Certification
NPOP-TN-0847-B11
2021-04 → 2024-03
Risk
Flood · Drought · Erosion
North Farm Pond FP-01
Primary · good quality · 290 TDS
Borewell BW-01 (Z1)
Secondary · good quality · 380 TDS
Certification & Inspection Timeline
Cert Body
NPOP
Cert Number
NPOP-TN-0847-B11
Last Inspection
2024-11-05
Next Inspection
2025-11-05
All 5 Plots in Z1-C3-B3· 4 active · 1 fallow
0.5 ac
21,780 sqft
Soil
Water
Location
Infrastructure
Compost: 0.7t / season
Risk
Labour (days / 0.5 ac)
2.8
Planting
1.2
Weeding/mo
1.7
Harvest
0.5 ac
21,780 sqft
Soil
Water
Location
Infrastructure
Compost: 0.9t / season
Risk
Labour (days / 0.5 ac)
3.1
Planting
1.3
Weeding/mo
1.9
Harvest
0.5 ac
21,780 sqft
Soil
Water
Location
Infrastructure
Compost: 1.1t / season
Risk
Labour (days / 0.5 ac)
3.4
Planting
1.5
Weeding/mo
2.1
Harvest
0.5 ac
21,780 sqft
Soil
Water
Location
Infrastructure
Compost: 1.3t / season
Risk
Labour (days / 0.5 ac)
3.7
Planting
1.6
Weeding/mo
2.3
Harvest
0.5 ac
21,780 sqft
Soil
Water
Location
Infrastructure
Compost: 1.5t / season
Risk
Labour (days / 0.5 ac)
4
Planting
1.8
Weeding/mo
2.5
Harvest
Survey 8. Black cotton with drip modification. Performing well for turmeric.